ReassemblyReassembly
REASSEMBLY
PROCEDURE
1. INSTALL UPPER RADIATOR TANK
(a) Install a new upper radiator tank.
Text in Illustration
*1
Upper Radiator Tank
*2
Core Plate
*a
Correc ...
Replacement
REPLACEMENT
PROCEDURE
1. REPLACE INTAKE VALVE GUIDE BUSH
(a) Heat the cylinder head to 80 to 100°C (176 to 212°F).
(b) Place the cylinder head on wooden blocks.
(c) Using SST and a hammer, tap out the intake valve guide bushes.
SST: 09201-10000
09201-01050
SST: 09950-70010 ...
Diagnosis System
DIAGNOSIS SYSTEM
1. DESCRIPTION
(a) The steering lock ECU (steering lock actuator or UPR bracket assembly) stores
DTCs when a malfunction occurs in the system. These DTCs can be confirmed by using
the Techstream.
NOTICE:
When using the Techstream with the engine switch off to confirm ...