Installation
INSTALLATION
PROCEDURE
1. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY
(a) Connect the actuator hose and connector.
(b) Install the No. 1 mounting support with the 3 bolts.
Torque:
186 N·m {1 ...
Related Tacoma materials
Inspection
INSPECTION
PROCEDURE
1. INSPECT FUEL INJECTOR ASSEMBLY
NOTICE:
This inspection aims at inspecting the fuel injectors for opens or shorts, because
the fuel injectors of this vehicle are a high-pressure type and cannot be inspected
for fuel injection volume.
(a) Measure the resistance accordi ...
Components
COMPONENTS
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
...
Data List / Active Test
DATA LIST / ACTIVE TEST
HINT:
By accessing the Data List displayed on the Techstream, you can perform such
functions as reading the values of switches and sensors without removing any parts.
Reading the Data List is the first step of troubleshooting and is one method to
shorten labor time.
...
