Disposal
ComponentsInstallation
INSTALLATION
PROCEDURE
1. INSPECT FRONT PROPELLER SHAFT ASSEMBLY (with Grease Fitting)
HINT:
When replacing the spider bearing, make sure that the grease fitting assembly
hole is facing in the direction shown in the illustration.
Text in Illustration
*1
No. 1 Grease Fi ...
Customize Parameters
CUSTOMIZE PARAMETERS
1. CUSTOMIZING WITH THE TECHSTREAM
HINT:
The following items can be customized.
NOTICE:
When the customer requests a change in a function, first make sure that
the function can be customized.
Record the current settings before customizing.
When troublesh ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT NO. 1 ULTRASONIC SENSOR
(a) Measure the resistance according to the value(s) in the table below.
Text in Illustration
*a
Component without harness connected:
(No. 1 Ultrasonic Sensor)
Standar ...