Installation
ComponentsFront Blower Resistor
Inspection
INSPECTION
PROCEDURE
1. INSPECT BLOWER RESISTOR
(a) Check the resistance.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified
...
Inspection
INSPECTION
PROCEDURE
1. INSPECT BRAKE BOOSTER PUMP ASSEMBLY
(a) Connect the positive (+) lead from the battery to the red cable of the pump,
and the negative (-) lead to the black cable.
(b) Check the brake booster pump operation.
OK:
Operation sound is heard. ...
Fail-safe Chart
FAIL-SAFE CHART
1. FAIL-SAFE OPERATION AND DEACTIVATION CONDITION
DIFFERENTIAL SYSTEM (w/ Differential Lock)
DTC No.
Fail-safe Operation
Fail-safe Deactivation Condition
U0122
All switching prohibited
When rear differential is locked ...