Interior
ComponentsInverter Relay
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT INVERTER RELAY
(a) Check the resistance.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
...
Terminals Of Ecu
TERMINALS OF ECU
CHECK ECM
HINT:
The standard voltage, resistance and waveform between each pair of the ECM terminals
is shown in the table below. The appropriate conditions for checking each pair of
the terminals is also indicated. The result of checks should be compared with the
standar ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL REAR NO. 2 POWER WINDOW REGULATOR SWITCH ASSEMBLY
(a) Engage the 2 claws to install the rear No. 2 power window regulator switch
assembly.
2. INSTALL INSTRUMENT PANEL LOWER CENTER FINISH PANEL
Click here
3. INSTALL NO. 2 INSTRUMENT PANEL GARNISH SUB-ASSEMB ...