Installation
Door Control ReceiverCargo Light Switch
Components
COMPONENTS
ILLUSTRATION
Inspection
INSPECTION
PROCEDURE
1. INSPECT DECK LIGHT SWITCH ASSEMBLY
(a) Check the resistance.
(1) Measure the resistance according to the value(s) in the table below.
Text in Illustration
*a
Compone ...
Operation Check
OPERATION CHECK
1. INSPECT INTERIOR LIGHT CONTROL OPERATION
NOTICE:
Perform this inspection with the customize parameters at the default settings.
The interior light control illuminates the lights below.
Engine Switch Illumination*1
Transponder Key Coil (Ignition Key Cylinder Light)* ...
Open in Bus 2 Main Bus Line
DESCRIPTION
There may be an open circuit in one of the CAN main bus lines and/or a central
gateway ECU (network gateway ECU) branch lines when the resistance between terminals
18 (CA4H) and 17 (CA4L) of the central gateway ECU (network gateway ECU) is 70 Ω
or higher.
Detection It ...