Reassembly
ComponentsReplacement
REPLACEMENT
PROCEDURE
1. REPLACE INTAKE VALVE GUIDE BUSH
(a) Heat the cylinder head to 80 to 100°C (176 to 212°F).
(b) Place the cylinder head on wooden blocks.
(c) Using SST and a hammer, tap out the intake valve guide bushes.
SST: 09201-10000
09201-01050
SST: 09950-70010 ...
Removal
REMOVAL
PROCEDURE
1. PRECAUTION
CAUTION:
Be sure to read Precaution thoroughly before servicing (See page
).
NOTICE:
After turning the ignition switch off, waiting time may be required before disconnecting
the cable from the negative (-) battery terminal. Therefore, make sure to read the
...
Charging Failure
PROCEDURE
1.
CHECK GENERATOR PULLEY WITH CLUTCH (ON-VEHICLE INSPECTION)
(a) Start the engine and visually check if the fan of the generator rotor assembly
located inside the generator assembly is operating.
OK:
The fan of the generator rotor assembly is operati ...