Removal
ComponentsInspection
INSPECTION
PROCEDURE
1. INSPECT OIL CLEARANCE
(a) Using a micrometer and caliper gauge, measure the oil seal clearance.
Standard clearance:
0.021 to 0.043 mm (0.0008 to 0.0017 in.)
Maximum clearance:
0.07 mm (0.0028 in.)
If it is greater than the maximum, replace the vane pump assembly.
...
Horn Relay
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT HORN RELAY ASSEMBLY
(a) Check the resistance.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Connection
...
Initialization
INITIALIZATION
1. INITIALIZE POWER WINDOW CONTROL SYSTEM
NOTICE:
When a door window regulator assembly, power window regulator motor
assembly, door glass or door glass run is reinstalled or replaced, the power
window control system must be initialized. Functions such as the auto u ...