INSPECTION
PROCEDURE
1. INSPECT DIFFERENTIAL PINION AND SIDE GEAR
(a) Check that there is no damage to the pinion gear or side gear.
If the pinion gear and/or side gear is damaged, replace the differential.
2. INSPECT DIFFERENTIAL CASE
(a) Check that the differential case is not damaged.
If the differential case is damaged, replace it.
Removal
InstallationCruise Control Input Circuit (P0575)
DESCRIPTION
This DTC is stored when there is a malfunction in the ECM.
DTC No.
Detection Item
DTC Detection Condition
Trouble Area
P0575
Cruise Control Input Circuit
Either of the following conditions is met:
...
Installation
INSTALLATION
PROCEDURE
1. INSTALL REAR NO. 2 POWER WINDOW REGULATOR SWITCH ASSEMBLY
(a) Engage the 2 claws to install the rear No. 2 power window regulator switch
assembly.
2. INSTALL INSTRUMENT PANEL LOWER CENTER FINISH PANEL
Click here
3. INSTALL NO. 2 INSTRUMENT PANEL GARNISH SUB-ASSEMB ...
Stop Light Relay Circuit (C1A4B)
DESCRIPTION
The skid control ECU (master cylinder solenoid)*1 or skid control ECU (brake
actuator assembly)*2 sends a stop light operation request signal to the stop light
relay (stop light switch assembly). If the skid control ECU (master cylinder solenoid)*1
or skid control ECU (brake actua ...