Installation
ComponentsReassembly
REASSEMBLY
PROCEDURE
1. INSTALL STARTER ARMATURE ASSEMBLY
(a) Install the starter armature to the starter yoke.
2. INSTALL STARTER BRUSH HOLDER ASSEMBLY
(a) Install the starter brush holder assembly.
(b) Connect the 4 brushes to the starter brush holder assembly.
(1) Using a scre ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT CYLINDER HEAD SUB-ASSEMBLY
(a) Using a precision straightedge and feeler gauge, measure the warpage of the
contact surfaces where the cylinder head contacts the cylinder block sub-assembly
and manifolds.
Text in Illustration
*a
Intake S ...
Removal
REMOVAL
PROCEDURE
1. REMOVE TRANSMISSION INSULATOR RH (for 2GR-FKS)
2. REMOVE TRANSMISSION INSULATOR RH (for 2TR-FE)
3. SEPARATE WATER BY-PASS PIPE (for 2GR-FKS)
(a) Remove the 2 bolts to separate the water by-pass pipe from the automatic
transmission assembly.
...