Related Tacoma materials
Initialization
INITIALIZATION
1. PROCEDURES NECESSARY WHEN BATTERY TEMINAL IS DISCONNECTED/RECONNECTED
Necessary Procedure
Effect/Inoperative Function when Necessary Procedures are not Performed
Link
Perform ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL REAR ENGINE OIL SEAL
(a) Apply MP grease to the lip of a new rear engine oil seal.
NOTICE:
Keep the lip free of foreign matter.
(b) Using SST, tap in a new rear engine oil seal until its surface is
flush with the rear engine oil seal retainer ed ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT FUEL INJECTOR ASSEMBLY
NOTICE:
This inspection aims at inspecting the fuel injectors for opens or shorts, because
the fuel injectors of this vehicle are a high-pressure type and cannot be inspected
for fuel injection volume.
(a) Measure the resistance accordi ...