INSTALLATION

PROCEDURE

1. INSTALL FLYWHEEL HOUSING SIDE COVER

(a) Install the flywheel housing side cover to the cylinder block sub-assembly.

2. INSTALL STARTER ASSEMBLY

(a) Install the starter assembly with the 2 bolts.

Torque:

37 N·m {377 kgf·cm, 27 ft·lbf}

(b) Connect the engine wire with the bolt and nut.

Torque:

Bolt :

8.0 N·m {82 kgf·cm, 71 in·lbf}

Nut :

9.8 N·m {100 kgf·cm, 87 in·lbf}

(c) Close the terminal cap.

(d) Connect the starter assembly connector.

(e) Connect the engine wire with the bolt.

Torque:

13 N·m {133 kgf·cm, 10 ft·lbf}

3. INSTALL STARTER COVER

(a) Install the starter cover with the 3 bolts.

Torque:

12 N·m {117 kgf·cm, 8 ft·lbf}

4. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH

Click here 5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:

5.4 N·m {55 kgf·cm, 48 in·lbf}

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click here Reassembly