Installation
ComponentsComponents
COMPONENTS
ILLUSTRATION
*1
NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
*2
OIL PAN COVER SILENCER
*3
NO. 1 OIL PAN PLUG
-
-
N*m (kgf*cm, ft.*lbf): Specified torque
-
...
Inspection
INSPECTION
PROCEDURE
1. INSPECT MAGNET STARTER SWITCH ASSEMBLY
(a) Inspect the pull-in coil.
(1) Measure the resistance according to the value(s) in the table below.
Text in Illustration
*a
Terminal 50
*b
...
Installation
INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP ASSEMBLY
(a) Install the vane pump assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
(b) Connect the ground wire with the bolt.
Torque:
8.5 N·m {87 kgf·cm, 75 in·lbf}
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Install a ne ...