Suspension
ComponentsData List / Active Test
DATA LIST / ACTIVE TEST
1. DATA LIST
HINT:
Using the Techstream to read the Data List allows the values or states of switches,
sensors, actuators and other items to be read without removing any parts. This non-intrusive
inspection can be very useful because intermittent conditions or signals ...
Initialization
INITIALIZATION
1. INITIALIZE POWER WINDOW CONTROL SYSTEM
NOTICE:
When a door window regulator assembly, power window regulator motor
assembly, door glass or door glass run is reinstalled or replaced, the power
window control system must be initialized. Functions such as the auto u ...
Hydraulic Test
HYDRAULIC TEST
1. PERFORM HYDRAULIC TEST
(a) Measure the line pressure.
CAUTION:
The line pressure test should always be performed with at least 2 people. One
person should observe the condition of the wheels and wheel chocks while the other
is performing the test.
NOTICE:
Perform ...