INSTALLATION
PROCEDURE
1. INSTALL FRONT NO. 2 SPEAKER ASSEMBLY RH
(a) Connect the connector.
(b) Install the front No. 2 speaker assembly RH with the 2 bolts.
Torque:
8.4 N·m {86 kgf·cm, 74 in·lbf}
NOTICE:
2. INSTALL FRONT NO. 2 SPEAKER ASSEMBLY LH
(a) Connect the connector.
(b) Install the front No. 2 speaker assembly LH with the 2 bolts.
Torque:
8.4 N·m {86 kgf·cm, 74 in·lbf}
NOTICE:
3. INSTALL NO. 2 INSTRUMENT PANEL SPEAKER PANEL SUB-ASSEMBLY
(See page
)
4. INSTALL NO. 1 INSTRUMENT PANEL SPEAKER PANEL SUB-ASSEMBLY
(See page
)
5. INSTALL FRONT PILLAR GARNISH RH
(See page
)
6. INSTALL ASSIST GRIP SUB-ASSEMBLY
(See page
)
7. INSTALL FRONT PILLAR GARNISH LH
(See page
)
Inspection
Microphone AmplifierA-TRAC Indicator Light Remains ON
DESCRIPTION
This is the A-TRAC main switch circuit. When the A-TRAC switch is turned on with
the transfer in L4, the A-TRAC function is available and the A-TRAC indicator light
illuminates.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
NOTICE:
When replacing the skid control ECU (master ...
Radio Broadcast cannot be Received or Poor Reception
PROCEDURE
1.
CHECK RADIO AND DISPLAY RECEIVER ASSEMBLY
(a) Check the radio automatic station search function.
(1) Check the radio automatic station search function by activating it.
Result
Result
Proceed to
Automatic station ...
Data List / Active Test
DATA LIST / ACTIVE TEST
1. DATA LIST
HINT:
Using the Techstream to read the Data List allows the values or states of switches,
sensors, actuators and other items to be read without removing any parts. This non-intrusive
inspection can be very useful because intermittent conditions or signals ...