Inspection
INSPECTION
PROCEDURE
1. INSPECT FRONT DOOR COURTESY SWITCH
(a) Check the resistance.
(1) Measure the resistance using an ohmmeter, and check the results in accordance with the value( s) in the table below.
Standard:
|
Tester Connection |
Condition |
Specified Condition |
|---|---|---|
|
1-Switch body |
ON (When shaft is pressed) |
10 kΩ or higher |
|
1-Switch body |
OFF (When shaft is not pressed) |
Below 1 Ω |
If the result is not as specified, replace the front door courtesy light switch assembly.
Fog Light RelayInstallation
INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP ASSEMBLY
(a) Install the vane pump assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
(b) Connect the ground wire with the bolt.
Torque:
8.5 N·m {87 kgf·cm, 75 in·lbf}
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Install a ne ...
CD cannot be Ejected
PROCEDURE
1.
CHECK OPERATION
(a) Press the disc eject switch of the radio and display receiver assembly for
5 seconds or more and check that the CD is ejected.
OK:
CD is ejected.
NG
REPLACE RADIO AND DISPLAY RECEIVER ASSEMBLY
...
Terminals Of Ecu
TERMINALS OF ECU
1. TERMINAL INSPECTION
Text in Illustration
*a
Component without harness connected
(Steering Lock ECU (Steering Lock Actuator or UPR Bracket Assembly))
-
-
(a) Measure the voltage and resistance according to the value(s) i ...