Components
COMPONENTS
ILLUSTRATION
Removal
REMOVAL
PROCEDURE
1. REMOVE LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
(See page
)
2. REMOVE INSTRUMENT LOWER PANEL ASSEMBLY
3. REMOVE ECM (for 2TR-FE)
(See page
)
4. REMOVE ECM (for 2GR-FKS)
(See page
)
5. REMOVE BLOWER MOTOR CONTROL
(a) Disconnect the 2 connectors. |
|
(b) Remove the 2 screws and blower motor control.
Installation
INSTALLATION
PROCEDURE
1. INSTALL BLOWER MOTOR CONTROL
(a) Install the blower motor control with the 2 screws.
(b) Connect the 2 connectors.
2. INSTALL ECM (for 2GR-FKS)
(See page
)
3. INSTALL ECM (for 2TR-FE)
(See page
)
4. INSTALL INSTRUMENT LOWER PANEL ASSEMBLY
5. INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
(See page
)
Engine does not Start but Initial Combustion Occurs
DESCRIPTION
If the key ID codes of the key and transponder key ECU assembly match, the engine
immobiliser system is unset and the engine start permission signal is sent to the
ECM. When the ID codes of the transponder key ECU assembly and ECM match, the engine
starts.
WIRING DIAGRAM
CAUTI ...
Operation Check
OPERATION CHECK
CHECK LANE DEPARTURE ALERT MAIN SWITCH
(a) Check the lane departure alert main switch (steering pad switch assembly)
on/off operation.
(1) Turn the ignition switch to ON.
(2) Confirm that the lane departure alert indicator (green) in the combination
meter assembly illuminates ...
Automatic Transmission Unit(for 2gr-fks)
Components
COMPONENTS
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
...