Intake Air Control Valve Actuator(for Acis)
ComponentsOperation Check
OPERATION CHECK
1. CHECK AUTO OPERATION
NOTICE:
Make sure that initialization has been completed before inspection (See
page ).
The sliding roof auto operation can be customized. Make sure that the
auto operation is ON (See page ).
HINT:
When pressing the switch for ...
Initialization
INITIALIZATION
NOTICE:
Initialization can only be performed for vehicles with a tire pressure
warning reset switch.
If initialization is performed, the existing tire positions will be
cleared, but will be automatically identified when the vehicle is driven
at 37 km/h (23 mp ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP ASSEMBLY
(a) Install the vane pump assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
(b) Connect the ground wire with the bolt.
Torque:
8.5 N·m {87 kgf·cm, 75 in·lbf}
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Install a ne ...