INSPECTION
PROCEDURE
1. INSPECT DIFFERENTIAL PINION AND SIDE GEAR
(a) Check that there is no damage to the pinion gear or side gear.
If the pinion gear and/or side gear is damaged, replace the differential.
2. INSPECT DIFFERENTIAL CASE
(a) Check that the differential case is not damaged.
If the differential case is damaged, replace it.
Removal
InstallationA-TRAC Indicator Light Remains ON
DESCRIPTION
This is the A-TRAC main switch circuit. When the A-TRAC switch is turned on with
the transfer in L4, the A-TRAC function is available and the A-TRAC indicator light
illuminates.
WIRING DIAGRAM
CAUTION / NOTICE / HINT
NOTICE:
When replacing the skid control ECU (master ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL OCCUPANT DETECTION ECU
(a) Check that the ignition switch is OFF.
(b) Check that the cable is disconnected from the battery negative (-) terminal
is disconnected.
CAUTION:
After removing the cable from the terminal, wait for at least 90 seconds before
star ...
Removal
REMOVAL
CAUTION / NOTICE / HINT
CAUTION:
Some of these service operations affect the SRS. Read the precautionary notices
concerning the SRS before servicing.
Click here
PROCEDURE
1. PRECAUTION
NOTICE:
After turning the ignition switch off, waiting time may be required before disconnectin ...