INSPECTION
PROCEDURE
1. INSPECT DIFFERENTIAL PINION AND SIDE GEAR
(a) Check that there is no damage to the pinion gear or side gear.
If the pinion gear and/or side gear is damaged, replace the differential.
2. INSPECT DIFFERENTIAL CASE
(a) Check that the differential case is not damaged.
If the differential case is damaged, replace it.
Removal
InstallationOpen in Stop Light Switch Circuit (C1425)
DESCRIPTION
The skid control ECU (brake actuator assembly) detects the brake operating conditions
through a signal transmitted by the stop light switch.
The skid control ECU incorporates a circuit to detect an open circuit. This DTC
is output when an open circuit is detected in the stop light ...
Network Gateway Ecu
Components
COMPONENTS
ILLUSTRATION
Installation
INSTALLATION
PROCEDURE
1. INSTALL NETWORK GATEWAY ECU
(a) Install the network gateway ECU with the bolt.
Torque:
3.0 N·m {31 kgf·cm, 27 in·lbf}
(b) Connect the connector.
2. INSTALL LOWER INSTRUMENT PANEL ASSEMBLY
(See page )
R ...
Power Source Control ECU Malfunction (B2782)
DESCRIPTION
DESCRIPTION The certification ECU (smart key ECU assembly) has a power source
mode switching function.
This DTC is stored when the IGE input (the steering lock motor activation permission
signal) sent directly from the certification ECU (smart key ECU assembly) to the
steering lo ...