Front Door Courtesy Switch
ComponentsRemoval
REMOVAL
PROCEDURE
1. REMOVE TRANSMISSION INSULATOR RH (for 2GR-FKS)
2. REMOVE TRANSMISSION INSULATOR RH (for 2TR-FE)
3. SEPARATE WATER BY-PASS PIPE (for 2GR-FKS)
(a) Remove the 2 bolts to separate the water by-pass pipe from the automatic
transmission assembly.
...
Cargo Light
Components
COMPONENTS
ILLUSTRATION
Removal
REMOVAL
PROCEDURE
1. REMOVE ROOF HEADLINING ASSEMBLY
for Double Cab:
(See page
)
for Access Cab:
(See page
)
2. REMOVE CARGO LIGHT ASSEMBLY (CENTER STOP LIGHT ASSEMBLY)
(a) Remove the 2 nuts.
...
Inspection
INSPECTION
PROCEDURE
1. INSPECT PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY
(a) Using a dial indicator, check the propeller shaft runout.
Maximum runout:
0.6 mm (0.0236 in.)
If the shaft runout is greater than the maximum, replace the shaft.
2. INSPECT PROPELLER SHAFT
(a) Using a dial ...