ComponentsInstallation
INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP ASSEMBLY
(a) Install the vane pump assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
(b) Connect the ground wire with the bolt.
Torque:
8.5 N·m {87 kgf·cm, 75 in·lbf}
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Install a ne ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT PARK/NEUTRAL POSITION SWITCH
(a) Measure the resistance according to the value(s) in the table below.
Text in Illustration
*a
Component without harness connected
(Park/Neutral Position Switch)
...
Sun visors
Type A
Forward position: Flip down.
Side position: Flip down, unhook,
and swing to the side.
Type B
Forward position: Flip down.
Side position: Flip down, unhook,
and swing to the side.
Side extender: Place in side position,
then slide backwards. ...