Inspection
INSPECTION
PROCEDURE
1. INSPECT TOWING TAIL RELAY
(a) Check the resistance.
(1) Using an ohmmeter, measure the resistance between the terminals.
Standard:
|
Tester Connection |
Specified Condition |
|---|---|
|
3-5 |
10 kΩ or higher |
|
3-5 |
Below 1 Ω (When battery voltage applied to terminals 1 and 2) |
If the result is not as specified, replace the towing tail relay.

