Inspection
INSPECTION
PROCEDURE
1. INSPECT REAR DOOR COURTESY SWITCH
(a) Check the resistance.
(1) Measure the resistance using an ohmmeter, and check the results in accordance with the value( s) in the table below.
Standard:
|
Tester Connection |
Condition |
Specified Condition |
|---|---|---|
|
1-Switch body |
ON (When shaft is pressed) |
10 kΩ or higher |
|
1-Switch body |
OFF (When shaft is not pressed) |
Below 1 Ω |
If the result is not as specified, replace the rear door courtesy light switch assembly.
Rear Combination Light Assembly
Room Light AssemblyReceiver Error (C2176/76)
DESCRIPTION
Tire pressure warning valve and transmitter signals are transmitted to the tire
pressure warning ECU and receiver in the vehicle as radio waves.
DTC No.
Detection Item
DTC Detection Condition
Trouble Area
Note
C2 ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL RADIATOR ASSEMBLY
(a) Engage the 2 hooks and temporarily install the radiator assembly to the radiator
support sub-assembly.
(b) Install the radiator assembly with the 4 bolts.
Torque:
18 N·m {184 kgf·cm, 13 ft·lbf}
2. INSTALL FAN SHROUD
(a) Install th ...
Installation
INSTALLATION
PROCEDURE
1. SET NO. 1 CYLINDER TO TDC/COMPRESSION
2. INSTALL CAMSHAFT TIMING GEAR BOLT
NOTICE:
There are different types of camshaft timing gear bolts. Make sure to check the
identification mark to determine the tightening torque.
*a
Identification Ma ...