INSTALLATION
CAUTION / NOTICE / HINT
HINT:
Item |
Temperature |
---|---|
Vehicle Body |
40 to 60°C (104 to 140°F) |
Front Fender Wheel Opening Moulding or Quarter Panel Wheel Opening Moulding |
20 to 30°C (68 to 86°F) |
NOTICE:
Do not heat the vehicle body or front fender wheel opening moulding or quarter panel wheel opening moulding excessively.
PROCEDURE
1. INSTALL FRONT FENDER WHEEL OPENING MOULDING (w/ Mudguard)
(a) Clean the vehicle body surface.
(1) Using a heat light, heat the vehicle body surface.
(2) Remove the double-sided tape from the vehicle body.
(3) Wipe off any tape adhesive residue with cleaner.
(b) Install the front fender wheel opening moulding.
(1) Using a heat light, heat the vehicle body and front fender wheel opening moulding.
(2) Remove the release paper from the front fender wheel opening moulding.
HINT:
After removing the release paper, keep the exposed adhesive free from foreign matter.
(3) Engage the 3 claws and 9 clips to install the front fender wheel opening moulding.
(4) Install the 7 screws.
2. INSTALL FRONT FENDER WHEEL OPENING MOULDING (w/o Mudguard)
(a) Clean the vehicle body surface.
(1) Using a heat light, heat the vehicle body surface.
(2) Remove the double-sided tape from the vehicle body.
(3) Wipe off any tape adhesive residue with cleaner.
(b) Install the front fender wheel opening moulding.
(1) Using a heat light, heat the vehicle body and front fender wheel opening moulding.
(2) Remove the release paper from the front fender wheel opening moulding.
HINT:
After removing the release paper, keep the exposed adhesive free from foreign matter.
(3) Engage the 3 claws and 9 clips to install the front fender wheel opening moulding.
(4) Install the 4 screws.
3. INSTALL FRONT FENDER MUDGUARD (w/ Mudguard)
(See page )
4. INSTALL QUARTER PANEL WHEEL OPENING MOULDING (w/ Mudguard)
(a) Clean the vehicle body surface.
(1) Using a heat light, heat the vehicle body surface.
(2) Remove the double-sided tape from the vehicle body.
(3) Wipe off any tape adhesive residue with cleaner.
(b) Install the quarter panel wheel opening moulding.
(1) Using a heat light, heat the vehicle body and quarter panel wheel opening moulding.
(2) Remove the release paper from the quarter panel wheel opening moulding.
HINT:
After removing the release paper, keep the exposed adhesive free from foreign matter.
(3) Engage the 10 clips to install the quarter panel wheel opening moulding.
(4) Install the 3 screws.
5. INSTALL QUARTER PANEL WHEEL OPENING MOULDING (w/o Mudguard)
(a) Clean the vehicle body surface.
(1) Using a heat light, heat the vehicle body surface.
(2) Remove the double-sided tape from the vehicle body.
(3) Wipe off any tape adhesive residue with cleaner.
(b) Install the quarter panel wheel opening moulding.
(1) Using a heat light, heat the vehicle body and quarter panel wheel opening moulding.
(2) Remove the release paper from the quarter panel wheel opening moulding.
HINT:
After removing the release paper, keep the exposed adhesive free from foreign matter.
(3) Engage the 10 clips to install the quarter panel wheel opening moulding.
(4) Install the 7 screws.
6. INSTALL REAR QUARTER PANEL MUDGUARD (w/ Mudguard)
(See page )
Inspection
INSPECTION
PROCEDURE
1. INSPECT RADIATOR CORE SUB-ASSEMBLY
Check the core plate for damage.
Text in Illustration
*1
Core Plate
*2
Radiator Core
If the sides of the core plate groove are deformed, it is impossible
to reassem ...
Dtc Check / Clear
DTC CHECK / CLEAR
1. CHECK DTC (for TIRE PRESSURE WARNING ECU AND RECEIVER) (USING TECHSTREAM)
(a) Turn the ignition switch off.
(b) Connect the Techstream to the DLC3.
(c) Turn the ignition switch to ON.
(d) Turn the Techstream on.
(e) Enter the following menus: Chassis / Tire Pressure Monito ...
OnStar Additional Information
OnStar Smart Driver
OnStar Smart Driver provides
information about driving behavior to
help maximize overall vehicle
performance, reduce wear and tear,
and enhance fuel efficiency. An
Insurance Discounts Eligibility
feature is also offered within OnStar
Smart Driver. See www.onstar.com
for details r ...