INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP ASSEMBLY
(a) Install the vane pump assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
(b) Connect the ground wire with the bolt.
Torque:
8.5 N·m {87 kgf·cm, 75 in·lbf}
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Install a new gasket to the pressure feed tube assembly.
(b) Connect the pressure feed tube assembly with the union bolt.
Torque:
50 N·m {510 kgf·cm, 37 ft·lbf}
(c) Connect the oil pressure switch connector.
NOTICE:
Make sure that no oil adheres to the connector.
3. CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE
(a) Connect the No. 1 oil reservoir to pump hose and slide the clip to secure it.
4. INSTALL FRONT FENDER APRON UPPER SEAL RH
5. INSTALL FAN AND GENERATOR V BELT
6. ADD POWER STEERING FLUID
7. BLEED POWER STEERING FLUID
8. INSPECT FOR POWER STEERING FLUID LEAK
9. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
Torque:
30 N·m {306 kgf·cm, 22 ft·lbf}
10. INSTALL NO. 2 ENGINE UNDER COVER SUB-ASSEMBLY (w/ Off Road Package)
Torque:
30 N·m {306 kgf·cm, 22 ft·lbf}
InspectionOn-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT DRIVE BELT
(a) Visually check the belt for defects, such as excessive wear and frayed cords.
If any defects are found, replace the drive belt.
HINT:
Replace the belt if there are any missing ribs.
2. BLEED POWER STEERING SYSTEM
(a) Check the fluid ...
ECU Malfunction (B1003)
DESCRIPTION
DTC No.
DTC Detection Condition
Trouble Area
B1003
A malfunction in the non-volatile storage of the central gateway ECU
(network gateway ECU) is detected.
Central gateway ECU (network gateway ECU)
PROC ...
Rear Shock Absorber
Components
COMPONENTS
ILLUSTRATION
Inspection
INSPECTION
PROCEDURE
1. INSPECT REAR SHOCK ABSORBER
(a) Compress and extend the shock absorber rod and check that there is no abnormal
resistance or abnormal sounds during operation.
If there is any abnormality, replace the shock absorb ...