Tire information
Customizable featuresInstallation
INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP ASSEMBLY
(a) Install the vane pump assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
(b) Connect the ground wire with the bolt.
Torque:
8.5 N·m {87 kgf·cm, 75 in·lbf}
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Install a ne ...
Problem Symptoms Table
PROBLEM SYMPTOMS TABLE
HINT:
The forward recognition camera is used by multiple systems. If any malfunctions
occur, refer to Problem Symptoms Table of each system.
Dynamic radar cruise control system (for 2GR-FKS): Click here
Dynamic radar cruise control syste ...
Data List / Active Test
DATA LIST / ACTIVE TEST
1. READ DATA LIST
HINT:
Using the Techstream to read the Data List allows the values or states of switches,
sensors, actuators and other items to be read without removing any parts. This non-intrusive
inspection can be very useful because intermittent conditions or sig ...