Symbols used in illustrations
Key informationInstallation
INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP
(a) Install the vane pump assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
(b) Connect the oil pressure switch connector.
NOTICE:
Make sure that no oil adheres to the connector.
...
Components
COMPONENTS
ILLUSTRATION
*A
w/ Front Spoiler
-
-
*1
RADIATOR GRILLE
*2
FRONT NO. 1 WHEEL OPENING EXTENSION PAD
ILLUSTRATION
*A
w/o Over Fender
-
- ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL REAR BRAKE DRUM SUB-ASSEMBLY
(a) Install a new drum gasket onto the rear brake drum.
(b) Install the rear brake drum.
2. ADJUST REAR DRUM BRAKE SHOE CLEARANCE
(a) Provisionally install the hub nuts.
(b) Remove the hole plug, and turn the adjuster to expand ...