Installation
INSTALLATION
PROCEDURE
1. INSTALL WATER INLET WITH THERMOSTAT SUB-ASSEMBLY
(a) Install a new gasket to the water inlet with thermostat sub-assembly.
(b) Install the water inlet with thermostat sub ...
Components
COMPONENTS
ILLUSTRATION
ILLUSTRATION
...
Related Tacoma materials
Turn Signal Switch Circuit
DESCRIPTION
The combination meter assembly receives the turn signal switch information and
controls the turn signal lights.
WIRING DIAGRAM
PROCEDURE
1.
READ VALUE USING TECHSTREAM (TURN SIGNAL SWITCH)
(a) Connect the Techstream to the DLC3.
(b) Turn the igni ...
Removal
REMOVAL
PROCEDURE
1. REMOVE TRANSMISSION INSULATOR RH (for 2GR-FKS)
2. REMOVE TRANSMISSION INSULATOR RH (for 2TR-FE)
3. SEPARATE WATER BY-PASS PIPE (for 2GR-FKS)
(a) Remove the 2 bolts to separate the water by-pass pipe from the automatic
transmission assembly.
...
Dtc Check / Clear
DTC CHECK / CLEAR
1. DTC CHECK / CLEAR (when Using Techstream)
(a) Check for DTCs.
(1) Connect the Techstream to the DLC3.
(2) Turn the ignition switch to ON.
(3) Turn the Techstream on.
(4) Enter the following menus: Chassis / ABS/VSC/ TRAC / Trouble Codes.
(5) Read the DTCs by following the ...