Inspection
INSPECTION
PROCEDURE
1. INSPECT MAGNET-CLUTCH RELAY
|
(a) Check the resistance. (1) Using an ohmmeter, measure the resistance between the terminals. Standard:
If the result is not as specified, replace the relay. |
|
Heater Relay
Ptc Heater AssemblyReassembly
REASSEMBLY
PROCEDURE
1. INSTALL SHIFT SOLENOID VALVE SLT
(a) Install the shift solenoid valve SLT and straight pin to the transmission
valve body assembly.
2. INSTALL SHIFT SOLENOID VALVE SL2
(a) Install the shift solenoid valv ...
Engine Switch
Components
COMPONENTS
ILLUSTRATION
Inspection
INSPECTION
PROCEDURE
1. INSPECT ENGINE SWITCH
(a) Measure the resistance according to the value(s) in the table below.
Text in Illustration
*a
Component without harness connected
(Engine Switch)
-
...
Diagnosis System
DIAGNOSIS SYSTEM
1. CHECK DLC3
(a) The vehicle's ECU uses the ISO 9141-2 for communication protocol. The terminal
arrangement of the DLC3 complies with SAE J1962 and matches the ISO 15765-4 format.
Symbols (Terminal No.)
Terminal Description
Condition
...