Toyota Tacoma manuals

Toyota Tacoma 2015-2018 Service Manual: Installation

INSTALLATION

PROCEDURE

1. INSTALL GENERATOR ASSEMBLY

(a) Install the generator bracket to the generator assembly with the bolt.

Torque:

20 N·m {204 kgf·cm, 15 ft·lbf}

(b) Install the generator assembly with the 2 bolts.

Torque:

43 N·m {438 kgf·cm, 32 ft·lbf}

(c) Connect the generator bracket to the cylinder block sub-assembly with the bolt.

Torque:

20 N·m {204 kgf·cm, 15 ft·lbf}

(d) Engage the clamp and connect the engine wire to the generator bracket.

(e) Connect the engine wire to the generator assembly with the 2 bolts.

Torque:

8.0 N·m {82 kgf·cm, 71 in·lbf}

(f) Connect the engine wire to the terminal B with the nut.

Torque:

9.8 N·m {100 kgf·cm, 87 in·lbf}

(g) Install the terminal cap.

(h) Connect the connector to the generator assembly .

(i) Install the wire harness clamp bracket with the bolt.

Torque:

8.0 N·m {82 kgf·cm, 71 in·lbf}

(j) Engage the clamp and install the engine wire to the wire harness clamp bracket.

2. INSTALL NO. 1 SURGE TANK STAY

Click here 3. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY

3. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY

(a) Install the No. 2 idler pulley sub-assembly with the bolt.

Torque:

43 N·m {438 kgf·cm, 32 ft·lbf}

4. INSTALL V-BANK COVER

Click here 5. INSTALL BATTERY TRAY

5. INSTALL BATTERY TRAY

6. INSTALL BATTERY

7. INSTALL BATTERY CLAMP SUB-ASSEMBLY

(a) Install the battery clamp sub-assembly and tighten the nut.

Torque:

5.4 N·m {55 kgf·cm, 48 in·lbf}

8. CONNECT CABLE TO POSITIVE BATTERY TERMINAL

Torque:

5.4 N·m {55 kgf·cm, 48 in·lbf}

9. CONNECT CABLE TO NEGATIVE TERMINAL

Torque:

5.4 N·m {55 kgf·cm, 48 in·lbf}

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click here Reassembly

Inspection
INSPECTION PROCEDURE 1. INSPECT GENERATOR BRUSH HOLDER ASSEMBLY (a) Using a vernier caliper, measure the brush length. Text in Illustration *a Len ...

Reassembly
REASSEMBLY PROCEDURE 1. INSTALL GENERATOR DRIVE END FRAME BEARING (a) Using SST and a press, press in a new generator drive end frame bearing. SST: 09950-60010 09951-00470 SST: ...

Other materials:

Terminals Of Ecm
TERMINALS OF ECM 1. CHECK ECM HINT: The standard normal voltage between each pair of ECM terminals is shown in the table below. The appropriate conditions for checking each pair of terminals are also indicated. The result of checks should be compared with the standard normal voltage for t ...

Transponder Key Amplifier
Components COMPONENTS ILLUSTRATION Installation INSTALLATION PROCEDURE 1. INSTALL TRANSPONDER KEY COIL (a) Engage the 2 claws to install the transponder key coil. (b) Connect the connector. 2. INSTALL UPPER STEERING COLUMN COVER (S ...

Satellite Radio Tuner
Components COMPONENTS ILLUSTRATION Removal REMOVAL PROCEDURE 1. REMOVE RADIO AND DISPLAY RECEIVER ASSEMBLY WITH BRACKET (See page ) 2. REMOVE NO. 1 NAVIGATION WIRE (a) Disconnect the 6 connectors to remove the No. 1 navigation wire. ...

© 2011-2021 Copyright www.ttguide.net