INITIALIZATION
STEERING SENSOR ZERO POINT CALIBRATION
(a) Start the engine.
(b) Drive the vehicle straight ahead at 35 km/h (22 mph) or more for 5 seconds or more.
(c) Turn the ignition switch off.
How To Proceed With Troubleshooting
Operation CheckNoise Filter(for 2gr-fks)
Components
COMPONENTS
ILLUSTRATION
Removal
REMOVAL
PROCEDURE
1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
2. REMOVE V-BANK COVER
(See page )
3. REMOVE AIR CLEANER ASSEMBLY
(See page )
4. REMOVE RADIO SETTING CONDENSER
(a) Disconnect the connector.
(b) Remove the tape an ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
(a) Install the transmission control cable assembly from outside the vehicle
body and attach the 3 claws of the cable retainer.
(b) Install the 2 nuts.
Torque:
5.5 N·m {56 kgf·cm, 49 in·lbf}
(c) Connect the transmissi ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL NO. 1 STEREO JACK ADAPTER ASSEMBLY
(a) Engage the 2 claws to install the No. 1 stereo jack adapter assembly.
2. INSTALL INSTRUMENT PANEL LOWER CENTER FINISH PANEL
(See page )
3. INSTALL NO. 2 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY
(See page )
4. INSTALL F ...