Reassembly
ComponentsInstallation
INSTALLATION
PROCEDURE
1. INSPECT PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY (with Grease Fitting)
Text in Illustration
*1
Grease Fitting
-
-
*a
View A
*b
Front Side
HINT:
When replacing t ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL AIR CONDITIONER PRESSURE SENSOR
(a) Remove the vinyl tape from the air conditioner tube and accessory assembly
and connecting part of the air conditioner pressure sensor.
(b) Apply sufficiently compressor oil to a new O-ring and fitting surface of
the air co ...
Short to +B in Buzzer (C1ABD,C1ABE)
DESCRIPTION
DTC C1ABD is stored when the blind spot monitor sensor RH detects a
+B short in rear cross traffic alert buzzer (blind spot monitor buzzer)
circuit.
DTC C1ABE is stored when the blind spot monitor sensor RH detects a
ground short or open in rear cross traffic aler ...