INSTALLATION
PROCEDURE
1. SET NO. 1 CYLINDER TO TDC/COMPRESSION
2. INSTALL CAMSHAFT TIMING GEAR BOLT
NOTICE:
There are different types of camshaft timing gear bolts. Make sure to check the identification mark to determine the tightening torque.
*a |
Identification Mark Stamp |
Item |
Identification Mark Stamp |
|
---|---|---|
Intake Side |
Exhaust Side |
|
Type A |
A |
B |
Type B |
D |
G |
(a) Apply engine oil to the areas of the camshaft timing gear bolt shown in the illustration. |
|
(b) Temporarily install the camshaft timing gear bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
HINT:
Make sure that the flange part of the camshaft timing gear bolt is directly contacting the camshaft timing gear assembly.
(c) Loosen the camshaft timing gear bolt 60 to 180°.
(d) Using SST, hold the crankshaft pulley assembly. SST: 09213-54015 91651-60855 SST: 09330-00021 |
|
(e) Tighten the camshaft timing gear bolt.
Torque:
for Type A :
120 N·m {1224 kgf·cm, 89 ft·lbf}
for Type B :
95 N·m {969 kgf·cm, 70 ft·lbf}
3. INSTALL CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY
(See page )
4. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
Torque:
30 N·m {306 kgf·cm, 22 ft·lbf}
5. INSTALL NO. 2 ENGINE UNDER COVER SUB-ASSEMBLY (w/ Off Road Package)
Torque:
30 N·m {306 kgf·cm, 22 ft·lbf}
Operation Check
OPERATION CHECK
1. OPERATION DESCRIPTION
(a) Push-button start function:
(1) When the electrical key transmitter sub-assembly is in a detection area inside
the vehicle and the brake pedal is depressed, the engine is started by pressing
the engine switch.
(2) When the electrical key transmitt ...
Pressure Control Solenoid "G" Circuit Open (P280713)
DESCRIPTION
Changing from 1st to 6th is performed by the ECM turning shift solenoid valves
SL1, SL2, SL3 and SL4 on and off. If an open or short circuit occurs in any of the
shift solenoid valves, the ECM controls the remaining normal shift solenoid valves
to allow the vehicle to be operated ...
Components
COMPONENTS
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
...