General Maintenance
GENERAL MAINTENANCE
CAUTION / NOTICE / HINT
HINT:
Inspect these items when the engine is cold.
PROCEDURE
1. REPLACE CHAIN SUB-ASSEMBLY
HINT:
2. INSPECT DRIVE BELT
HINT:
3. REPLACE SPARK PLUGS
HINT:
4. REPLACE AIR CLEANER FILTER
(a) Replace the air filter with a new one.
5. REPLACE ENGINE OIL AND OIL FILTER
HINT:
6. REPLACE ENGINE COOLANT
HINT:
7. INSPECT RADIATOR FIN
(a) Check that the radiator and condenser are not blocked with leaves, dirt, or insets, and clean the hose connection.
8. INSPECT GASKET IN FUEL TANK CAP
HINT:
9. INSPECT CHARCOAL CANISTER
HINT:
10. INSPECT FUEL LINES, CONNECTIONS AND FUEL TANK VAPOR VENT SYSTEM HOSES AND FUEL TANK BAND
(a) Visually check the fuel lines for cracks, leakage, loose connections, deformation or tank band looseness.
11. INSPECT EXHAUST PIPE AND MOUNTING
(a) Visually check the pipes, hangers and connections for severe corrosion, leaks or damage.
On-vehicle Inspection
ON-VEHICLE INSPECTION
PROCEDURE
1. CHECK FUEL PUMP ASSEMBLY OPERATION
(a) Check fuel pressure.
(1) Connect the Techstream to the DLC3.
(2) Start the engine.
(3) Turn the Techstream on.
(4) Enter the following menus: Powertrain / Engine / Active Test / Control the
Target Fuel Pressure.
(5) ...
Installation
INSTALLATION
PROCEDURE
1. SET NO. 1 CYLINDER TO TDC/COMPRESSION
2. INSTALL CAMSHAFT TIMING GEAR BOLT
NOTICE:
There are different types of camshaft timing gear bolts. Make sure to check the
identification mark to determine the tightening torque.
*a
Identification Ma ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP ASSEMBLY
(a) Install the vane pump assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
(b) Connect the ground wire with the bolt.
Torque:
8.5 N·m {87 kgf·cm, 75 in·lbf}
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Install a ne ...