Replacement
ComponentsInstallation
INSTALLATION
PROCEDURE
1. INSTALL ROOF HEADLINING ASSEMBLY
(a) Insert the roof headlining assembly into the vehicle from the door.
NOTICE:
Check that the corners of the roof headlining assembly are not
folded, twisted or otherwise deformed and that none of the ...
Reassembly
REASSEMBLY
PROCEDURE
1. INSTALL REAR AXLE HUB BOLT
(a) Install a new deflector gasket and deflector onto the rear axle shaft.
HINT:
Align the 2 notches.
(b) Install the 6 bolts through the axle hub.
...
Pressure Control Solenoid "C" Circuit Open (P079513)
DESCRIPTION
Changing from 1st to 6th is performed by the ECM turning shift solenoid valves
SL1, SL2, SL3 and SL4 on and off. If an open or short circuit occurs in any of the
shift solenoid valves, the ECM controls the remaining normal shift solenoid valves
to allow the vehicle to be operated ...