ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Intake Side)
(a) Connect the Techstream to the DLC3.
(b) Start the engine.
(c) Turn the Techstream on.
(d) Enter the following menus: Powertrain / Engine / Active Test / Control the Intake VVT OCV Duty Ratio Bank 1 or Control the Intake VVT OCV Duty Ratio Bank 2 / Data List / Intake VVT Change Angle Bank 1 or Intake VVT Change Angle Bank 2.
(e) Read the Data List while performing the Active Test with the engine idling.
OK:
Techstream Operation |
Data List (Intake VVT Change Angle Bank 1 or Intake VVT Change Angle Bank 2) |
---|---|
-100% to 100% |
Varies by 75 DegFR or more |
2. INSPECT CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Exhaust Side)
(a) Connect the Techstream to the DLC3.
(b) Start the engine.
(c) Turn the Techstream on.
(d) Enter the following menus: Powertrain / Engine / Active Test / Control the Exhaust VVT OCV Duty Ratio Bank 1 or Control the Exhaust VVT OCV Duty Ratio Bank 2.
(e) Check the engine speed while operating the cam timing oil control solenoid assembly (for exhaust camshaft) using the Techstream.
OK:
Techstream Operation |
Engine Condition |
---|---|
0% |
Normal engine speed |
100% |
Engine idles roughly or stalls |
HINT:
Refer to "Data List / Active Test" [Exhaust VVT OCV Control Duty Ratio Bank 1
and Exhaust VVT Change Angle Bank 1 or Exhaust VVT OCV Control Duty Ratio Bank 2
and Exhaust VVT Change Angle Bank 2] (See page
).
Open in Front Floor Electrical Key Oscillator Circuit (B27A5)
DESCRIPTION
The certification ECU (smart key ECU assembly) generates a request signal and
transmits the signal to the No. 1 indoor electrical key antenna assembly (front
floor). For the No. 1 indoor electrical key antenna assembly (front floor) to detect
when the electrical key transmitter su ...
Installation
INSTALLATION
PROCEDURE
1. INSPECT FRONT PROPELLER SHAFT ASSEMBLY (with Grease Fitting)
HINT:
When replacing the spider bearing, make sure that the grease fitting assembly
hole is facing in the direction shown in the illustration.
Text in Illustration
*1
No. 1 Grease Fi ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY
(a) Connect the actuator hose and connector.
(b) Install the No. 1 mounting support with the 3 bolts.
Torque:
186 N·m {1899 kgf·cm, 138 ft·lbf}
(c) Install the No. 2 mounting support with the 2 bolts.
Torque:
160 N ...