1. INSTALL POWER STEERING LINK
(a) Insert the power steering link into the vehicle in the order shown in the illustration.
Install in this Direction (1) |
|
Install in this Direction (2) |
(b) Using SST, install the power steering link with the 2 bolts and 2 nuts. SST: 09961-01270 Torque: Specified tightening torque : 95 N·m {969 kgf·cm, 70 ft·lbf} NOTICE: While holding the nut in place, tighten the bolt. HINT:
|
|
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Connect the return hose and slide the clip to secure it.
(b) Using a 17 mm union nut wrench, tighten the flare nut and connect the pressure feed tube. Torque: Specified tightening torque : 24 N·m {245 kgf·cm, 18 ft·lbf} NOTICE: Do not damage the pressure feed tube. HINT:
|
|
(c) Install the tube support brackets with the 2 bolts.
Torque:
28 N·m {286 kgf·cm, 21 ft·lbf}
3. INSTALL TIE ROD END SUB-ASSEMBLY LH
Click here
4. INSTALL TIE ROD END SUB-ASSEMBLY RH
HINT:
Use the same procedure described for the LH side.
5. PLACE FRONT WHEELS FACING STRAIGHT AHEAD
6. INSTALL NO. 2 STEERING INTERMEDIATE SHAFT
(a) Align the matchmarks on the No. 2 steering intermediate shaft and power steering link. |
|
(b) Install the No. 2 steering intermediate shaft to the power steering link with bolt C.
Torque:
35 N·m {357 kgf·cm, 26 ft·lbf}
(c) Align the matchmarks on the steering intermediate shaft and steering sliding yoke. |
|
(d) Install the steering sliding yoke to the steering intermediate shaft and slide it upward.
(e) Align the matchmarks on the steering sliding yoke and No. 2 steering intermediate shaft.
(f) Install the steering sliding yoke to the No. 2 steering intermediate shaft with bolts A and B.
Torque:
35 N·m {357 kgf·cm, 26 ft·lbf}
7. INSTALL COOLER COMPRESSOR ASSEMBLY
(a) Install the 2 bolts and 2 nuts in the order shown in the illustration. Torque: 21 N·m {214 kgf·cm, 16 ft·lbf} |
|
(b) Install the suction hose sub-assembly with the bolt. Torque: 7.5 N·m {76 kgf·cm, 66 in·lbf} |
|
(c) Install the fan and generator V belt.
Click here
8. INSTALL AUTOMATIC TRANSMISSION OIL COOLER TUBE (for Automatic Transmission)
(a) Install the automatic transmission oil cooler tube and clamp with the bolt. Torque: 5.5 N·m {56 kgf·cm, 49 in·lbf} |
|
9. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY (for 4WD)
Click here
10. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
Torque:
30 N·m {306 kgf·cm, 22 ft·lbf}
11. INSTALL NO. 2 ENGINE UNDER COVER SUB-ASSEMBLY (w/ Off Road Package)
Torque:
30 N·m {306 kgf·cm, 22 ft·lbf}
12. INSTALL FRONT UPPER FENDER APRON SEAL
Click here
13. INSTALL FRONT WHEELS
Torque:
113 N·m {1152 kgf·cm, 83 ft·lbf}
14. INSPECT STEERING WHEEL CENTER POINT
15. ADD POWER STEERING FLUID
16. BLEED POWER STEERING FLUID
Click here
17. INSPECT FOR POWER STEERING FLUID LEAK
18. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
Click here
Clearance Warning Buzzer Circuit
DESCRIPTION
This circuit consists of the No. 1 clearance warning buzzer and clearance warning
ECU assembly. An ECU-excited type buzzer is used. The battery voltage supplied through
the buzzer is grounded inside the clearance warning ECU assembly using a pulsed
digital pattern, producing sound ...
Diagnostic Trouble Code Chart
DIAGNOSTIC TROUBLE CODE CHART
Steering Lock System
DTC Code
Detection Item
See page
B2781
Open / Short in Steering Lock ECU
B2782
Power Source Control ECU Malfunction
...
Removal
REMOVAL
PROCEDURE
1. REMOVE NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
2. REMOVE FRONT EXHAUST PIPE ASSEMBLY
(See page )
3. REMOVE NO. 1 OIL COOLER INLET TUBE AND NO. 1 OIL COOLER OUTLET TUBE
NOTICE:
When disconnecting the hoses from the tube, support the tube by hand and be careful
to prevent ...