Inspection
INSPECTION
PROCEDURE
1. INSPECT COOLER THERMISTOR SENSOR
(a) Check the resistance.
|
(1) Measure the resistance and check the results in accordance with the
values in the table below.
Standard:
|
Tester Connection
|
Condition
|
Specified Condition
|
|
1 - 2
|
-10°C (14°F)
|
7.40 to 9.20 kΩ
|
|
1 - 2
|
-5°C (23°F)
|
5.65 to 7.00 kΩ
|
|
1 - 2
|
0°C (32°F)
|
4.35 to 5.40 kΩ
|
|
1 - 2
|
5°C (41°F)
|
3.40 to 4.20 kΩ
|
|
1 - 2
|
10°C (50°F)
|
2.68 to 3.30 kΩ
|
|
1 - 2
|
15°C (59°F)
|
2.10 to 2.60 kΩ
|
|
1 - 2
|
20°C (68°F)
|
1.66 to 2.10 kΩ
|
|
1 - 2
|
25°C (77°F)
|
1.32 to 1.66 kΩ
|
|
1 - 2
|
30°C (86°F)
|
1.05 to 1.35 kΩ
|
If the result is not as specified, replace the cooler thermistor sensor.
NOTICE:
- Even slightly touching the sensor may change the resistance
value. Be sure to hold the connector of the sensor.
- When measuring, the sensor temperature must be almost the same
as the ambient temperature.
HINT:
As the temperature increases, the resistance decreases (see the graph
on the left).
|
|
Inspection
INSPECTION
PROCEDURE
1. INSPECT BLOWER RESISTOR
(a) Check the resistance.
(1) Measure the resistance according to the value(s) in the table below.
Standard Resistance ...
Inspection
INSPECTION
PROCEDURE
1. INSPECT HEATER RELAY
(a) Check the resistance.
(1) Using an ohmmeter, measure the resistance between each terminal.
Standard:
...