Inspection
INSPECTION
PROCEDURE
1. REMOVE DECK LIGHT RELAY
(a) Check the resistance.
|
(1) Measure the resistance according to the value(s) in the table below. Standard:
If the result is not as specified, replace the deck light relay. |
|
Daytime Running Light RelayData List / Active Test
DATA LIST / ACTIVE TEST
1. DATA LIST
HINT:
Using the Techstream to read the Data List allows the values or states of switches,
sensors, actuators and other items to be read without removing any parts. This non-intrusive
inspection can be very useful because intermittent conditions or signals ...
TRAC OFF Indicator Light Remains ON
DESCRIPTION
In 2WD mode:
Operation of the VSC OFF switch changes the vehicle between normal mode,
TRAC OFF mode (AUTO LSD mode) and VSC OFF mode. During normal mode, pressing
the VSC OFF switch for a short amount of time changes the vehicle to TRAC
OFF mode (AUTO LSD mode), TR ...
Reassembly
REASSEMBLY
PROCEDURE
1. INSTALL GENERATOR DRIVE END FRAME BEARING
(a) Using SST and a press, press in a new generator drive end frame bearing.
SST: 09950-60010
09951-00470
SST: 09950-70010
09951-07100
(b) Fit the ta ...