Inspection

INSPECTION

PROCEDURE

1. INSPECT NO. 1 DAY TIME RUNNING LIGHT RELAY

(a) Check the resistance.

(1) Measure the resistance according to the value(s) in the table below.

Standard:

Tester Connection

Condition

Specified Condition

3 - 5

Battery voltage is not applied to terminals 1 and 2

10 kΩ or higher

Battery voltage is applied to terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the No. 1 day time running light relay.