INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP ASSEMBLY
(a) Install the vane pump assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
(b) Connect the ground wire with the bolt.
Torque:
8.5 N·m {87 kgf·cm, 75 in·lbf}
2. CONNECT PRESSURE FEED TUBE ASSEMBLY
(a) Install a new gasket to the pressure feed tube assembly.
(b) Connect the pressure feed tube assembly with the union bolt.
Torque:
50 N·m {510 kgf·cm, 37 ft·lbf}
(c) Connect the oil pressure switch connector.
NOTICE:
Make sure that no oil adheres to the connector.
3. CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE
(a) Connect the No. 1 oil reservoir to pump hose and slide the clip to secure it.
4. INSTALL FRONT FENDER APRON UPPER SEAL RH
5. INSTALL FAN AND GENERATOR V BELT
6. ADD POWER STEERING FLUID
7. BLEED POWER STEERING FLUID
8. INSPECT FOR POWER STEERING FLUID LEAK
9. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
Torque:
30 N·m {306 kgf·cm, 22 ft·lbf}
10. INSTALL NO. 2 ENGINE UNDER COVER SUB-ASSEMBLY (w/ Off Road Package)
Torque:
30 N·m {306 kgf·cm, 22 ft·lbf}
InspectionIf you have a flat tire
Remove the flat tire and replace it with the spare provided.
■ Before jacking up the vehicle
● Stop the vehicle on a hard, flat surface.
● Set the parking brake.
● Shift the shift lever to P (automatic transmission) or R (manual transmission).
● Stop the engine.
& ...
Precaution
PRECAUTION
PRECAUTION FOR DISCONNECTING CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable from the negative (-) battery terminal, initialize
the following systems after the cable is reconnected.
Click here
IGNITION SWITCH EXPRESSIONS
(a) The type of ignition switch ...
Installation
INSTALLATION
PROCEDURE
1. INSTALL STEERING PAD
(a) Check that the ignition switch is off.
(b) Check that the cable is disconnected from the negative (-) battery terminal.
CAUTION:
Wait at least 90 seconds after disconnecting the cable from the negative (-)
battery terminal to disable the SRS ...