Inspection
ComponentsInstallation
INSTALLATION
PROCEDURE
1. INSTALL VANE PUMP
(a) Install the vane pump assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
(b) Connect the oil pressure switch connector.
NOTICE:
Make sure that no oil adheres to the connector.
...
Lost Communication with ECM / PCM "A" (U0100,U0129,U0142,U0151,U0163,U023A,U1104)
DESCRIPTION
The combination meter communicates with the ECM, skid control ECU, power steering
ECU, main body ECU (multiplex network body ECU), airbag sensor assembly, navigation
receiver assembly*1, radio and display receiver assembly*2, Forward recognition
camera*3 and Millimeter wave radar ...
USB port/AUX port
Connect an iPod, USB memory device or portable audio player to the USB port/AUX
port as indicated below. Select “iPod”, “USB” or “AUX” on the “Select Audio Source”
screen and the device can be operated via multimedia system.
Connecting using the USB port/AUX port
■ iPod
...