Installation
PrecautionCheck Bus 5 Line for Short to GND
DESCRIPTION
There may be a short circuit between one of the CAN bus lines and GND when there
is no resistance between terminal 15 (CA5H) of the central gateway ECU (network
gateway ECU) and terminal 4 (CG) of the DLC3, or terminal 16 (CA5L) of the central
gateway ECU (network gateway ECU) and ...
Front Blower Motor
Inspection
INSPECTION
PROCEDURE
1. INSPECT BLOWER MOTOR
(a) Inspect the blower motor.
(1) Connect the positive (+) lead from to terminal 1 and negative (-)
lead to terminal 2, then check that the motor operates smoothly.
CAUTION:
Use safety glasses
Do ...
Disposal
DISPOSAL
CAUTION / NOTICE / HINT
CAUTION:
Before performing pre-disposal deployment of any SRS part, review and closely
follow all applicable environmental and hazardous material regulations. Pre-disposal
deployment may be considered hazardous material treatment.
PROCEDURE
1. PRECAUTION
...