INSTALLATION
PROCEDURE
1. INSTALL TRANSFER POSITION SWITCH
(a) Attach the 2 claws to install the transfer position switch.
2. INSTALL AIR CONDITIONING CONTROL ASSEMBLY (for Automatic Air Conditioning System)
(See page
)
3. INSTALL INTEGRATION PANEL SUB-ASSEMBLY (for Manual Cooler System)
(See page
)
RemovalTerminals Of Ecu
TERMINALS OF ECU
1. AIR CONDITIONING AMPLIFIER ASSEMBLY
HINT:
Check from the rear of the connector while it is connected to the air conditioning
amplifier assembly.
Terminal No.
(Symbol)
Wiring Color
Terminal Description
Condition
Spe ...
Terminals Of Ecu
TERMINALS OF ECU
1. CHECK SLIDING ROOF ECU (SLIDING ROOF DRIVE GEAR SUB-ASSEMBLY)
(a) Disconnect the S50 sliding roof ECU (sliding roof drive gear sub-assembly)
connector.
(b) Measure the resistance and voltage according to the value(s) in the table
below.
HINT:
Measure the values on the ...
Check Bus 3 Line for Short to GND
DESCRIPTION
There may be a short circuit between one of the CAN bus lines and GND when there
is no resistance between terminal 6 (CA3H) of the central gateway ECU (network gateway
ECU) and terminal 4 (CG) of the DLC3, or terminal 21 (CA3L) of the central gateway
ECU (network gateway ECU) and ...