Installation
INSTALLATION
PROCEDURE
1. REMOVE MONOLITHIC CONVERTER PROTECTOR
(a) Install the upper monolithic converter protector and lower monolithic converter
protector with the 2 bolts and 2 nuts.
Torque:
11 N·m {107 kgf·cm, 8 ft·lbf}
(b) Install the clamp with the bolt as shown in the ...
Mechanical System Tests
MECHANICAL SYSTEM TESTS
1. STALL SPEED TEST
HINT:
This test is to check the overall performance of the engine and transmission.
CAUTION:
This test should be done on a paved surface (a surface that is not slippery).
To ensure safety, perform this test in an open and level area tha ...
Terminals Of Ecu
TERMINALS OF ECU
CHECK ECM
HINT:
The standard voltage, resistance and waveform between each pair of the ECM terminals
is shown in the table below. The appropriate conditions for checking each pair of
the terminals is also indicated. The result of checks should be compared with the
standar ...