Inspection
INSPECTION
PROCEDURE
1. INSPECT MAGNET-CLUTCH RELAY
|
(a) Check the resistance. (1) Using an ohmmeter, measure the resistance between the terminals. Standard:
If the result is not as specified, replace the relay. |
|
Heater Relay
Ptc Heater AssemblyDisposal
DISPOSAL
CAUTION / NOTICE / HINT
CAUTION:
Before performing pre-disposal deployment of any SRS part, review and closely
follow all applicable environmental and hazardous material regulations. Predisposal
deployment may be considered hazardous material treatment.
PROCEDURE
1. PRECAUTION
...
Installation
INSTALLATION
PROCEDURE
1. INSTALL ENGINE WATER PUMP ASSEMBLY
(a) Install the engine water pump assembly and a new gasket to the timing
chain cover assembly with the 15 bolts.
Torque:
for Bolt A and B :
11 N·m {112 kgf·cm, 8 ft·lbf}
for Bolt C :
21 N·m {214 kgf ...
Cruise SET Indicator Light Circuit
DESCRIPTION
The ECM illuminates the cruise control SET indicator by sending indicator output
demand signals to the combination meter assembly via CAN communication. The cruise
control SET indicator illuminates when the dynamic radar cruise control system is
controlling vehicle speed. The crui ...