Inspection
INSPECTION
PROCEDURE
1. INSPECT MAGNET-CLUTCH RELAY
|
(a) Check the resistance. (1) Using an ohmmeter, measure the resistance between the terminals. Standard:
If the result is not as specified, replace the relay. |
|
Heater Relay
Ptc Heater AssemblyCommunication Error from ECM to VSC (P1631)
DESCRIPTION
The ECM sends signals such as A/T information signals, dynamic radar cruise control
operation signals, brake operation demand signals, and buzzer operation demand signals
to the skid control ECU (brake actuator assembly) when the dynamic radar cruise
control is operating. Therefor ...
Components
COMPONENTS
ILLUSTRATION
*A
for Type A
*B
for Type B
*C
for Type C
-
-
*1
MILLIMETER WAVE RADAR SENSOR ASSEMBLY
*2
MILLIMETER WAVE RADAR WIRE
...
Dtc Check / Clear
DTC CHECK / CLEAR
1. CHECK DTC
(a) Connect the Techstream to the DLC3.
(b) Turn the ignition switch to ON.
(c) Turn the Techstream on.
(d) Enter the following menus: Body Electrical / (desired system) / Trouble Codes.
(e) Check the details of the DTC(s) (See page
).
2. CLEAR DTC
(a) Connec ...