Inspection
INSPECTION
PROCEDURE
1. INSPECT MAGNET-CLUTCH RELAY
|
(a) Check the resistance. (1) Using an ohmmeter, measure the resistance between the terminals. Standard:
If the result is not as specified, replace the relay. |
|
Heater Relay
Ptc Heater AssemblyProblem Symptoms Table
PROBLEM SYMPTOMS TABLE
NOTICE:
After replacing the stereo component tuner assembly of vehicles subscribed
to pay-type satellite radio broadcasts, XM radio ID registration is necessary
(w/ SDARS System).
HINT:
Use the table below to help determine the cause of proble ...
Removal
REMOVAL
PROCEDURE
1. REMOVE TRANSMISSION INSULATOR RH (for 2GR-FKS)
2. REMOVE TRANSMISSION INSULATOR RH (for 2TR-FE)
3. SEPARATE WATER BY-PASS PIPE (for 2GR-FKS)
(a) Remove the 2 bolts to separate the water by-pass pipe from the automatic
transmission assembly.
...
Installation
INSTALLATION
PROCEDURE
1. INSTALL CENTER STOP LIGHT ASSEMBLY (for Bulb Type Stop Light)
(a) Install the 3 center stop light bulbs to the 3 center stop light sockets.
(b) Turn the 3 center stop light sockets with 3 center stop light bulbs
in the direction indicated by the arrow sho ...