COMPONENTS
ILLUSTRATION
Inspection
INSPECTION
PROCEDURE
1. INSPECT PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY
(a) Using a dial indicator, check the propeller shaft runout.
Maximum runout:
0.6 mm (0.0236 in.)
If the shaft runout is greater than the maximum, replace the shaft.
2. INSPECT PROPELLER SHAFT
(a) Using a dial ...
Precaution
PRECAUTION
1. INSPECTION PROCEDURE FOR VEHICLE INVOLVED IN ACCIDENT
(a) Perform the zero point calibration and sensitivity check if any of the following
conditions apply.
The occupant detection ECU is replaced.
Accessories (seatback tray and seat cover, etc.) are installed.
The f ...
Pressure Control Solenoid "C" Circuit Open (P079513)
DESCRIPTION
Changing from 1st to 6th is performed by the ECM turning shift solenoid valves
SL1, SL2, SL3 and SL4 on and off. If an open or short circuit occurs in any of the
shift solenoid valves, the ECM controls the remaining normal shift solenoid valves
to allow the vehicle to be operated ...