Inspection
INSPECTION
PROCEDURE
1. INSPECT TOWING TAIL RELAY
(a) Check the resistance.
(1) Using an ohmmeter, measure the resistance between the terminals.
Standard:
|
Tester Connection |
Specified Condition |
|---|---|
|
3-5 |
10 kΩ or higher |
|
3-5 |
Below 1 Ω (When battery voltage applied to terminals 1 and 2) |
If the result is not as specified, replace the towing tail relay.
Stop Light Switch
Trailer SocketReassembly
REASSEMBLY
PROCEDURE
1. INSTALL COMPRESSOR PICK UP SENSOR
(a) Install the compressor pick up sensor with the 3 screws.
(b) Engage the clamp.
2. INSTALL MAGNET CLUTCH ASSEMBLY
(a) Secure the cooler compressor assembly in a vise between ...
Automatic Transmission Unit(for 2tr-fe)
Components
COMPONENTS
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
ILLUSTRATION
...
Clearance Sonar Main Switch Circuit
DESCRIPTION
The back sonar or clearance sonar switch assembly is installed at the base of
the driver side of the instrument panel.
When the back sonar or clearance sonar switch assembly is turned on, an on signal
is sent to the clearance warning ECU assembly. The intuitive parking assist syste ...