Cruise SET Indicator Light Circuit
PrecautionInstallation
INSTALLATION
PROCEDURE
1. INSPECT FRONT PROPELLER SHAFT ASSEMBLY (with Grease Fitting)
HINT:
When replacing the spider bearing, make sure that the grease fitting assembly
hole is facing in the direction shown in the illustration.
Text in Illustration
*1
No. 1 Grease Fi ...
Daytime Running Light Relay
Inspection
INSPECTION
PROCEDURE
1. INSPECT NO. 1 DAY TIME RUNNING LIGHT RELAY
(a) Check the resistance.
(1) Measure the resistance according to the value(s) in the table below.
Standard:
Tester Connection
Condition
Specified ...
Components
COMPONENTS
ILLUSTRATION
*A
for Access Cab
-
-
*1
NO. 1 FRONT DOOR NAME PLATE
*2
NO. 1 ROOF SIDE NAME PLATE
●
Non-reusable part
-
-
ILLUSTRAT ...